King County crews will be conducting repairs to an expansion joint on the West Sammamish River Bridge on Sept. 6.
This work will be performed between the hours of 7 a.m. and 7 p.m. Crews will arrive on-site to start the traffic control installation a little earlier. Traffic control will be in place, closing off the west (southbound) bridge completely and allowing one lane of traffic in each direction on the east bridge. Expect backups and delays throughout the day.
Any updates will be posted to the City’s website, www.kenmorewa.gov.